I just learned about the Schedule Stop feature, that allows me to enter stop duration for each stop.
Instead of entering duration one at a time for each stop, is there a way I can import stop durations as part of importing pushpin datasets from a MSExcel file?
I.e. I would have stop duration as a data field to be imported, then if I used that pushpin in a route, the stop duration for that pushpin/stop would already be ready?